Case Studies

Case studies: first orders, reorders and supplied packaging

Three typical project cases that show what actually has to be confirmed, at which step, between sampling and delivery of a cosmetics OEM project.

How to read these case studies

Three typical project cases covering the most common cooperation scenarios: an overseas first order, a domestic reorder, and a brand-supplied packaging project. Client details are anonymized; quantities and timelines use OULAN's published cooperation parameters (MOQ 1,000 units with labelling, 7–15 days for overseas orders, 35–45 days for domestic China orders). They explain how a project is run; they are not stock, price or schedule commitments for a specific project.

First serum order for an overseas brand: 1,000 units, shipped in 12 days

For a first private-label launch, the biggest risk is rarely the product — it is tying up cash in moulds and inventory before the market answers. This typical project used OULAN's published small-batch route to test first: mature formula, generic packaging, custom labels, 1,000 units.

Read the full case study →

Domestic brand reorder: batch consistency and the filing timeline, managed up front

Two things go wrong with reorders: the goods arrive feeling different from the first batch, or the schedule collapses at the filing step. This typical project moved all four checks — version, leftovers, filing and retained-sample comparison — ahead of production scheduling.

Read the full case study →

Brand-supplied packaging: compatibility cleared before production is scheduled

The classic failure with supplied packaging is not that it looks wrong — it is discovering on filling day that it does not match the bulk or the filling line. This typical project moved all verification up front: packaging passed three gates before it earned a place in the schedule.

Read the full case study →

Why the cases are anonymized

A brand client's formula, volumes and launch timing are commercial information; OULAN does not publish transaction details that identify a specific client. The typical cases keep the full project structure and published parameters, and readers can verify OULAN's MOQ, timelines and credentials against the linked guides. Feasibility and scheduling for a specific project are confirmed item by item.