Cost & Timeline

A complete OEM quotation should be split into 7 cost items — and compared on the same brief.

Split the quotation into bulk formula, direct packaging, outer packaging and printing, processing and filling, testing and filing, yield loss, and logistics and tax — then compare suppliers on the same brief, quantity and delivery boundary.

Direct answer

A complete cosmetics OEM quotation in China should be split into 7 cost items — bulk formula, direct packaging, outer packaging and printing, processing and filling, testing and filing, yield loss, and logistics and tax — and compared on the same brief, quantity and delivery boundary. OULAN's lead time, order to shipment, is 7–15 days for overseas orders and 35–45 days for domestic China orders. The 7–15-day overseas figure applies to stock / mature-formula projects with simple generic packaging; a full custom project with new packaging and market filing follows the 8-step timeline below, and domestic filing alone takes about 15 days.

Trust facts you can verify before you order

Production licence 粤妆20180156 (issued 6 May 2024, valid to 5 May 2029) · Intertek ISO 22716:2007 No. SZ2412H1 and US FDA Cosmetic GMP Guidelines (2022) No. SZ2412H2 (issued 17 December 2024, valid to 16 December 2027) · FDA MoCRA facility registration FEI 3033874671 · Unified social credit code 91440101MA59Q5CF99 · Factory: 8-1 Xinbei Road, Baiyun District, Guangzhou. See the verification guide: How to Verify a Cosmetics Manufacturer in China.

Table 1 — The 7 cost items in a quotation

Cost itemWhat it typically coversEasy to miss
Bulk formulaBase system, active ingredients, fragrance and colourPer-kg price vs per finished-unit fill
Direct packagingBottle, pump, cap, stopper, mask sheet, pouchStock vs custom colour / private-mould MOQ
Outer packaging & printingCarton, insert, label, shrink film, leafletPlate, proofing, surface finish, print loss
Processing & fillingFilling, packaging line, changeover, labourLine setup for small batches
Testing & filingTesting, safety assessment, filing coordinationRevision rounds and third-party fees — who pays?
Yield lossBulk loss, packaging loss, QC sampling, sparesLoss rate by dosage form and line
Logistics & taxFreight, warehousing, tax, deliveryDelivery point (EXW / FOB / DDP) and defective goods handling

Ask every supplier to quote the same brief and to list what is NOT included. A low quotation that omits packaging, testing, tax, logistics or defect handling is not comparable.

OULAN product prices are ¥6–¥50, with no upper limit; the final price depends on the customer's requirements. OULAN has no designated logistics provider; shipping is arranged per project.

How to work backwards from a retail price

Deduct channel margin, promotion, warehousing and logistics, after-sales, tax and target profit from the retail price to get the affordable finished-goods purchase ceiling. If the ceiling cannot support the original plan, simplify packaging processes and SKUs with no key value first — do not silently cut core efficacy or quality control.

Table 2 — The 8 steps, and what really sets the timeline

The source article describes an 8-step route. The table below reproduces the six steps for which reference rhythms were given in the draft; the remaining steps are confirmed per project.

StepReference rhythm (Chinese article)Key output
Enquiry + sampling1–7 daysBrief, sample feedback, preliminary cost
Visit + contractAs arrangedCooperation boundary, quality standard, payment terms
Packaging designFrom 1–3 daysBottle, size, label and print artwork
Packaging productionFrom 7–15 daysQualified packaging and delivery plan
Testing + filingDepends on product type and documentsTesting, safety assessment, label and filing documents
Production + shipmentFrom 7–10 daysFinished-goods inspection, batch record, shipment

The 8 steps above are the full custom route. OULAN's 7–15-day overseas lead time is the order-to-shipment figure for overseas orders using stock / mature formulas and simple generic packaging. It is achieved by running formula, packaging and compliance in parallel and by avoiding rework — not by skipping packaging compatibility, testing or production confirmation.

The most common delays are not on the production line

  • Requirements change after sample approval (new efficacy direction or fragrance).
  • Packaging not decided: formula is set, but bottle, pump and carton are still changing.
  • Label copy left late: name, claims or mandatory information need changing after design is done.
  • First-order quantity changes: packaging purchase, filling method and production schedule have to be redone.

Decision checklist (before RFQ / sampling / signing)

  1. Ask for a split quotation: bulk, packaging, printing, filling, testing and filing, tax and logistics, and yield loss.
  2. Compare on the same specification, quantity and delivery boundary.
  3. Put defect, change, rework and extra third-party fees in the contract.
  4. Set an owner and a deadline for each of: brief, sample, packaging, testing and filing, production and shipment. Keep sample numbers, artwork versions and every change record.

Frequently asked questions

Should a quotation include filing?

There is no single commercial quotation format. Confirm before cooperation who bears testing, safety assessment, filing documents and third-party fees.

Does a lower quotation always mean higher profit?

No. Also consider stability, complaints, rework, stock-outs, lead time and repeat purchase.

Can packaging and formula work in parallel?

Partly, yes — but packaging–formula compatibility must be confirmed before filling.

What do OULAN products cost?

OULAN product prices are ¥6–¥50, with no upper limit; the final price depends on the customer's requirements.

Sources and verification boundaries

  • NMPA Provisions for Cosmetics Registration and Filing; NMPA Cosmetics Labelling Measures.
  • Rules can change; confirm current documents for the target market.
  • This page is a project first-assessment guide, not a quotation, timeline, efficacy or compliance promise.