Sampling & Acceptance

Cosmetics sampling acceptance: don't just reply "too sticky".

Sample feedback needs a shared method — one sample number, one amount, one set of steps — so every round ends with a decision.

Direct answer

Accept a cosmetics sample with a single sample number, a fixed amount and fixed application steps, and record appearance, fragrance, spread, absorption, film feel, stickiness, pilling and packaging output separately. Feedback should say where in the routine the problem appears, against which reference sample, and how far it should move. OULAN is a Guangzhou efficacy-skincare OEM/ODM factory (production licence 粤妆20180156, FDA MoCRA FEI 3033874671). Overseas MOQ is 1,000 units with simple generic packaging; lead time, order to shipment, is 7–15 days.

Trust facts you can verify before you order

Production licence 粤妆20180156 (issued 6 May 2024, valid to 5 May 2029) · Intertek ISO 22716:2007 No. SZ2412H1 and US FDA Cosmetic GMP Guidelines (2022) No. SZ2412H2 (issued 17 December 2024, valid to 16 December 2027) · FDA MoCRA facility registration FEI 3033874671 · Unified social credit code 91440101MA59Q5CF99 · Factory: 8-1 Xinbei Road, Baiyun District, Guangzhou. See the verification guide: How to Verify a Cosmetics Manufacturer in China.

Without a shared method, sample feedback can't be compared

  • Give every sample a number, so nobody has to discuss "the bottle from yesterday".
  • Fix the amount, the application area, the products used before it, and the observation time.
  • Set one reference sample, so "lighter" becomes a comparable target instead of a feeling.
  • Record personal preference and target-user needs separately.

What actionable feedback looks like

Vague feedbackActionable feedback
Too stickyStill noticeably tacky on the hands 30 seconds after applying the suggested amount; aim for a feel close to reference sample A
Not moisturising enoughObvious tightness two hours after layering with night cream in the evening; aim for a softer finish in the later stage
Don't like the fragranceTop note too sweet, and the scent lasts more than 30 minutes; aim for a lighter strength and a fresher direction

Start an Enquiry — send your product direction and sampling brief

Don't use a small sample to confirm mass production

A sample settles the formula and experience direction. Mass production still needs confirmation of scale-up, final packaging, filling output, sealing, batch inspection and transport. Before formal production, lock the version: the approved sample's formula, packaging and document versions must match.

If you change something after approval, hand the change over properly

After a sample is approved, changing the fragrance, pump head, size or label should start with a record of the original version, the change target and the current material status — then confirm what extra verification, cost and time the change needs. The exact scope is assessed per project; an old approval does not carry over automatically.

How a sampling order with OULAN works

  • Route: mature formula / stock product for private label, or custom formula development; free sampling and small-batch testing are available before a full order.
  • MOQ: 1,000 units with simple generic packaging and labelling; complex packaging is calculated separately.
  • Lead time, order to shipment: 7–15 days for overseas orders; 35–45 days for domestic orders, because domestic filing alone takes about 15 days and filing can be rejected.
  • What to send first: product direction, channel and target price positioning, preferred format, quantity range, packaging preference (generic vs custom), and any benchmark product.

Frequently asked questions

How many people should try a sample?

It depends on the product stage and the target group. Internal trials cannot replace the testing or efficacy evaluation that regulations require.

Can one sampling round change many things at once?

It can, but the more variables change at once, the harder it is to tell which change caused the result. Confirm changes in rounds, by priority.

What is OULAN's MOQ and lead time?

The MOQ is 1,000 units with simple generic packaging and labelling. Lead time, order to shipment, is 7–15 days for overseas orders. Complex packaging is calculated separately; confirm the timeline per project.

Sources and verification boundaries

Related guides