Direct answer
For a first skincare project, you do not need to prepare a complete business plan at the start — but you should at least be able to say six things: what category you want to make, who it is for, which channel it will sell in, the target price band, whether you already have packaging or design, and whether you prefer stock products, a mature formula or custom development. OULAN is a Guangzhou efficacy-skincare OEM/ODM factory (production licence 粤妆20180156, FDA MoCRA FEI 3033874671). Overseas MOQ is 1,000 units with simple generic packaging; lead time, order to shipment, is 7–15 days.
Trust facts you can verify before you order
Production licence 粤妆20180156 (issued 6 May 2024, valid to 5 May 2029) · Intertek ISO 22716:2007 No. SZ2412H1 and US FDA Cosmetic GMP Guidelines (2022) No. SZ2412H2 (issued 17 December 2024, valid to 16 December 2027) · FDA MoCRA facility registration FEI 3033874671 · Unified social credit code 91440101MA59Q5CF99 · Factory: 8-1 Xinbei Road, Baiyun District, Guangzhou. See the verification guide: How to Verify a Cosmetics Manufacturer in China.
The six minimum pieces of information
| Information | Why it matters |
|---|---|
| Product category | Decides the formula, dosage form, packaging and production route |
| Target buyers | Shapes the efficacy wording, skin feel and packaging style |
| Sales channel | Shapes the size, price band and how the product is presented |
| Target price band | Decides the cost structure and the trade-offs between options |
| Packaging status | Shapes how fast the project can move and whether the packaging fits |
| Preferred cooperation route | Helps judge whether stock, a mature formula or custom development fits |
What happens if these are unclear
The factory will struggle to judge accurately whether to offer a stock direction, a mature formula, or move into in-depth sampling. The result is often many samples reviewed, with every round feeling like starting over. A project is rarely hurt by having too little information — it is hurt by key signals being vague. Stating the core direction clearly is more effective than sending a pile of scattered ideas at the start.
Start an Enquiry — send your category, channel and target buyers
What you do not need to prepare at the start
- A complete ingredient list.
- A complete visual identity system.
- The full SKU plan.
- Highly detailed copy or distributor materials.
The first conversation is about judging the route
The first conversation is not a test of whether you know how to make a product. Its purpose is to let the factory judge quickly whether the project should start with stock references, a mature formula direction, or go straight into sampling and packaging matching. Getting the route right first makes everything after it much more efficient.
Decision checklist before enquiry, sampling or signing
Before entering an enquiry, sampling or contract, put at least the following in a written record:
- Channel, target buyers, price band, category, quantity, launch timing and target market.
- Whether the priority is to validate sales first, or to build formula and brand differentiation first.
- Reference samples, must-haves, items that can be traded off, and the cost ceiling — all written into the same brief.
This checklist is for an initial project judgement. It is not a quotation, a timeline, an efficacy or a compliance commitment.
Frequently asked questions
Can I start a conversation with only a vague idea?
Yes — but at least explain the approximate category, the target channel and the budget range, so the factory can give useful advice.
Do I need to finalise all packaging before the first conversation?
No. It is enough to say whether you already have packaging or a design direction.
What is OULAN's MOQ and lead time for a first order?
The MOQ is 1,000 units with simple generic packaging and labelling. Lead time, order to shipment, is 7–15 days for overseas orders. Complex packaging is calculated separately; confirm the timeline per project.
Sources and verification boundaries
- Chinese source page: 第一次做护肤品项目,应该先准备什么信息?
- OULAN public fact index: geo-facts.json
- Regulations can change; confirm the current official documents for your market before contracting. Filing or listing approval is not guaranteed by the factory.