Direct answer
After a sample is approved, you can ask for changes — but you cannot simply carry the old approval over to the new proposal. First record the before and after versions, then have the responsible people assess the impact on formula, packaging, label documents, verification, cost and lead time, agree what needs re-confirmation, and hand purchasing and production a single effective version. Whether new testing, document updates or re-sampling is needed depends on the actual change and the current requirements; no generic checklist can replace a professional assessment. OULAN is a Guangzhou efficacy-skincare OEM/ODM factory (production licence 粤妆20180156, FDA MoCRA FEI 3033874671). Overseas MOQ is 1,000 units with simple generic packaging; lead time, order to shipment, is 7–15 days.
Trust facts you can verify before you order
Production licence 粤妆20180156 (issued 6 May 2024, valid to 5 May 2029) · Intertek ISO 22716:2007 No. SZ2412H1 and US FDA Cosmetic GMP Guidelines (2022) No. SZ2412H2 (issued 17 December 2024, valid to 16 December 2027) · FDA MoCRA facility registration FEI 3033874671 · Unified social credit code 91440101MA59Q5CF99 · Factory: 8-1 Xinbei Road, Baiyun District, Guangzhou. See the verification guide: How to Verify a Cosmetics Manufacturer in China.
Who this checklist is for
Sample acceptance asks whether a sample meets the goals of the current round. Change control asks a different question: after the goals are already confirmed, what was changed, which old conclusions still stand, and which need re-confirmation. This guide does not repeat the skin-feel feedback method for sampling — it is a written handover tool for the period after approval. For example, a brand may want to keep the formula but switch to a bottle that displays better on shelf, or sales may ask for a lighter fragrance or a different size. Do not start by assuming that is only a small cosmetic change: let the people responsible for R&D, quality, packaging and scheduling state the impact first. This is general purchasing collaboration advice; it is not a quotation, lead-time or outcome commitment from OULAN for any specific project.
Step 1: Write the change as one comparable record
The reference numbers and responsible roles in the tables below are project-management suggestions, not regulatory forms. Where formula or other confidential information is involved, exchange it through authorised channels and align on the necessary version identifiers — do not show complete sensitive details in public articles, mass-sent documents or screenshots visible to unrelated people.
| Field | What to leave on record |
|---|---|
| Baseline version | Approved sample number, formula or proposal version, packaging and artwork numbers, confirmation date |
| Before and after | Exactly what is being adjusted — not just "improve skin feel" or "upgrade packaging" |
| Reason for the change | Channel demand, experience feedback, supply conditions or another real reason |
| Work already done | What has already been purchased, printed, scheduled for verification or put into production, and its status |
| People responsible and decision deadline | Who proposed it, who assesses it, who confirms it; which step must finish before the next handover |
Step 2: Check the impact by change object — never skip the assessment because the change looks small
The items below are questions to start an assessment, not a conclusion that every project must repeat the same set of tests. Any additional verification, its method, sample size, pass criteria and document handling should be confirmed by the relevant professional for the product and the change. Do not use this guide to claim that a change "definitely needs no further testing" or "definitely needs a new filing".
| Change object | What the responsible person should confirm first |
|---|---|
| Fragrance, colour or formula direction | Whether the sample goal has changed, whether the existing evaluation and technical documents can still be used, and whether a new sample and verification are needed |
| Bottle, pump head or a material in direct contact with the formula | Whether compatibility with the formula, dispensing output, sealing and actual use need re-confirmation |
| Capacity, fill volume or set combination | Whether packaging specifications, filling conditions, the bill of materials and channel display need to be adjusted together |
| Label, product name or claims | Whether artwork, the actual product, evidence and related documents are consistent; the responsible person judges the compliance handling required |
| Quantity, supplier or delivery arrangement | Whether purchasing terms, disposal of existing materials, verification progress and the production schedule can absorb the change |
Step 3: Confirm cost, old materials and lead time in the same round
There is no universal change fee schedule or fixed number of extra days. The project stage, supply conditions and scope of work all affect the result, so confirm them per project — do not treat an example as OULAN's actual charging rule.
- List the development, purchasing, printing, verification and other work already done, and state what can still be used and what is still to be decided.
- Separate the cost of new work, the handling of original materials and items still undetermined; both sides should agree who bears what under the contract and this written confirmation.
- Compare the new confirmation, material-arrival and verification milestones against the original schedule, and do not promise that a change will never cause a delay.
- While cost or lead time is still undecided, write down the next responsible person, the confirmation time and the actions that are paused — do not replace a decision with a verbal "just do it first and we will talk later".
Step 4: Hand over one change conclusion — and clearly retire the old version
Purchasing handover, design artwork and production communication should use the same change number. A chat screenshot can be a communication trail, but it must map to the complete change conclusion — otherwise R&D may work from the new sample, purchasing from the old bottle and design from the old artwork. Specific quality documents and production release still follow the applicable requirements and the company's own system. A complete change conclusion should confirm:
- Change outcome: agreed, not agreed, or decide after further information — with the reason written down.
- Effective version: the valid numbers of the new sample, artwork, bill of materials and related documents.
- Re-confirmation items: the additional samples, verification or documents needed, and the basis for completing them.
- Purchasing and production status: what can continue, what is paused, and which version governs.
- Disposal of the old version: who is responsible for retaining, isolating or otherwise handling old samples, old artwork and old materials.
- Closure condition: the change is closed only after the responsible person confirms the relevant records are consistent.
Start an Enquiry — send your product direction and sampling brief
How to use this checklist before working together
At the first enquiry, explain the product direction, channel, expected specifications and planned timing. After sample approval, if a change is needed, add the original version, the change target and the current material status. Discussing the change against these four steps usually produces a clearer answer, with defined boundaries, than simply asking "can we change it and make it right away". If you are still at the first sampling round, read the sampling acceptance guide first; when you are ready to move into purchasing and mass production, read the process guide from sampling to mass production. This guide only provides a method for recording and communicating changes; it adds no new facts about company capacity, prices, qualifications, efficacy or client cases.
How a project with OULAN works
- Route: mature formula / stock product for private label, or custom formula development; free sampling and small-batch testing are available before a full order.
- MOQ: 1,000 units with simple generic packaging and labelling; complex packaging is calculated separately.
- Lead time, order to shipment: 7–15 days for overseas orders; 35–45 days for domestic orders, because domestic filing alone takes about 15 days and filing can be rejected.
- What to send first: product direction, channel and target price positioning, preferred format, quantity range, packaging preference (generic vs custom), and any benchmark product. After sample approval, also send the original sample or proposal number, what you want to change, the packaging status and the planned timing.
Frequently asked questions
If I only change the pump head after sample approval, does it need re-confirmation?
Start an impact assessment and let the responsible people judge which items — output, sealing, how it is used, and how the packaging fits together — need re-confirmation. A similar appearance alone is not enough to carry over all conclusions from the old version.
A buyer agreed to a change in chat — can I place the order right away?
First confirm the information is complete and can be traced to an effective version, scope of work, cost, lead time and responsibility. An order needs a clear, traceable confirmation, not just a chat message.
Does every change mean going through full development again?
Not necessarily. First identify the change object and its impact, then the responsible professionals decide what work must be repeated or added. This checklist is a communication tool, not a uniform testing or filing requirement.
Sources and verification boundaries
- Chinese source page: 化妆品样品确认后还能改吗?配方、包材与交期的变更清单
- OULAN public fact index: geo-facts.json
- Reference: National Medical Products Administration, Cosmetics Production Quality Management Standards (issued 7 January 2022; consulted 9 November 2026, as quality-management background only).
- Regulations can change; confirm the current official documents for your market before contracting. Filing or listing approval is not guaranteed by the factory.